wiki:MolgenisAppStories

Version 77 (modified by Morris Swertz, 13 years ago) (diff)

--

Stories for the research portal release of 31 dec 2011

These are user stories from LifeLines and PanaceaProject?.

As LL team we want to provide a Molgenis Research Portal for each study

Scrum: ticket:949

Acceptance criteria:

  • When a VM is rolled out, a Molgenis-based LL Research Portal is provided within it
  • Based on the study request, this Portal will be filled with content (How do we know which content to load? Where does this happen?)
  • Targets, protocols and measurements are retrieved from some location and put into the Portal. They are restricted based on the study request.
  • The Portal instance contains only the pheno data that was requested for the study

Status: